Instaplast Ready-Mix Plaster

About

Product Description

Instaplast The innovative solution for filling wall chases (Jiri) in electrical and plumbing work, is designed to meet the need for immediate plastering, especially in situations where traditional plastering is not feasible.

Instaplast eliminates the need for water curing and provides superior bonding strength compared to conventional plaster. Most importantly, the surface is ready for use in 2–3 hours after application, ensuring efficiency and reliability.

SUITABLE SURFACE

Commercial Applications

image_Cemeco Plast

Road Repair & Patchwork

image_Cemeco Plast

Industrial Flooring Solutions

image_Cemeco Plast

Transportation Infrastructure Repairs

image_Cemeco Plast

Marine & Coastal Structure Maintenance

image_Cemeco Plast

Tunnel Restoration & Reinforcement

Residential Applications

image_Cemeco Plast

Wall Crack & Surface Repairs

image_Cemeco Plast

Ceiling Plaster Restoration

image_Cemeco Plast

Terrace & Roof Waterproofing

image_Cemeco Plast

Wet Area (Bathroom) Maintenance

image_Cemeco Plast

Driveway & Pathway Repairs

image_Cemeco Plast
Instaplast Ready-mix Plaster

Surface Preparation

Dry and clean

Ensure the surface is free from dust, dirt, oil, grease, loose particles, or any substance that may affect bonding. Clean the surface using a wire brush or high-pressure water jet. Ensure the surface is free from dampness, active leakage, algae, or fungal growth.

Roughness

Ensure the surface is sound and structurally stable. Pre-wet the surface and apply a cement–water slurry prior to application. Repair weak or damaged areas using Instaplast RMP.

Evenness

Level the surface for uniform application.

Technical Data

Table Header Table Header Table Header Table Header
Pot Life
30-40 minutes under normal climate
Initial Setting Time
20-30 Min
Final Setting Time
2-3 hours
Water Retentivity
Min 95%
Compressive Strength
Upto 18 Mpa
Pull-Off Adhesion Strength
Upto 0.8 Mpa
Water Requirement
0.13-0.15 litres per kg
Max Silt Content in Sand
Less than 5%
Referred Relevant Standards

Apply in layers:

Mixing Instructions:

Application:

Curing:

Shelf Life

Storage Recommendations:

image_Cemeco Plast

Guidelines For Ideal Results

Follow all application instructions for surface preparation and mixing.

Mix in batches that can be used within 45-60 minutes.

Ensure the wall surface is neither too dry nor too moist before application.

Protect freshly plastered surfaces for at least 8 hours to prevent cracking.

Do not reuse mixed plaster or add water to a set mixture.

Avoid mixing materials from different batches.

Safety & Precautions

Use safety gloves, goggles, and dust masks during handling.

Avoid inhalation of the mix and contact with eyes.

Keep the work area dust-free and wash hands thoroughly after use.

In case of eye contact, rinse immediately with clean water and seek medical attention if necessary.